PROJECTS

Heavy Lifting & Re-level

Waterman Place (Christchurch)

Situation

A block of 12 commercial units, all precast concrete construction with various foundations all approximately 1.5 metres deep. The building was built very close to the estuary, so Meccanico undertook the work in dryer summer months, to ensure the water table was more manageable. Over four weeks, the block of units was lifted 200mm then the units were re-levelled.

TESTIMONIALS

Working with the world’s best